Green Ridge Elementary School Additions and Renovations
Cumberland Valley School District

1. PROJECT STATUS:
Active

2. PROJECT TYPE:
Educational

3. PROJECT SIZE:
New Construction: 73,587 SF
Renovation: 67,650 SF
Total Building: 141,237 SF

4. SCOPE OF WORK:
Selective demolition of portions of the existing Green Ridge Elementary School and construction of additions and renovations for the Cumberland Valley School District. Generally, the new construction consists of load bearing masonry, structural steel framing, steel joists and metal deck, masonry veneer, exterior metal wall panels, mechanically attached EPDM membrane roofing, aluminum windows, storefront system, curtain wall system, casework and interior finishes along with the specified mechanical, electrical and plumbing systems.

Renovations consist of replacement of interior finishes including, but not limited to, ceiling tile, flooring, casework, countertops, painting, hollow metal frames and doors, exterior windows and specified mechanical, electrical and plumbing systems.

Site construction consists of a new entrance drive and roadway, subsequent parking, a new parent drop-off driveway, parking, lighting, stormwater management systems, play areas, segmental retaining walls and new athletic multi-purpose fields.

5. ESTIMATED CONSTRUCTION COSTS:
General Construction: $21.6M
HVAC Construction: $7.4M
Plumbing Construction: $1.9M
Electrical Construction: $5.5M
Site Construction: $7.96M
Total: $44.3M