Martin Meylin Middle School Additions and Renovations
Lampeter-Strasburg School District
1. PROJECT STATUS:
Active
2. PROJECT TYPE:
Educational
3. PROJECT SIZE:
New Construction: 6,000 SF
Renovations: 145,000 SF
4. SCOPE OF WORK:
Approx. 145,000 SF heavy phased-occupied renovations (5 phases identified on the drawings with detail). All new finishes on interiors as well as new roof, metal panels on exterior with some masonry restoration.
Approx 8,000 SF of demo of small portion of the building and building a 6,000 SF addition in its place. Owner has established swing space in the building and is planning on 12 modular classrooms with toilets to swing kids. This contract will be responsible for extending utilities and all hookups to the portables incl. water, sewer and elect/technology.
As part of the base project there is a new fire service required with underground storage tank and fire pump building as shown on the documents. The building will be fully sprinklered at the completion.
Owner will utilize an Owners Representative for construction.
5. ESTIMATED CONSTRUCTION COSTS:
General Construction: $20,900,000
HVAC Construction: $7,400,000
Plumping Construction Including FP: $5,600,000
Electrical Construction: $8,200,000
Total: $42,100,000