Eagle View Middle School Additions and Renovations
Cumberland Valley School District

1. PROJECT STATUS:
Active

2. PROJECT TYPE:
Educational

3. PROJECT SIZE:
New Construction: 144,200 SF
Renovations: 116,429 SF
Total Building: 260,629 SF

4. SCOPE OF WORK:
Selective demolition of portions of the existing Eagle View Middle School and construction of additions and renovations for the Cumberland Valley School District. Generally, the new construction consists of load bearing masonry, structural steel framing, steel joists and metal deck, masonry veneer, exterior metal wall panels, mechanically attached EPDM membrane roofing, aluminum windows, storefront system, curtain wall system, casework, and interior finishes along with the specified mechanical, electrical and plumbing systems.

Renovations consist of replacement of interior finishes including, but not limited to, ceiling tile, flooring, casework, countertops, painting, hollow metal frames and doors, exterior windows and specified mechanical, electrical, and plumbing systems.

Site construction consists of new parent and bus driveways, access roads, subsequent parking, lighting, stormwater management systems, and fencing.

5. ESTIMATED CONSTRUCTION COSTS:
General Construction: $38.9M
HVAC Construction: $11.1M
Plumbing Construction: $4.9M
Electrical Construction: $10.3M
Site Construction: $6.6M
Total: $71.8M